The thing that did help mine out some was we made a pvc framework under it. Simple letter E turned sideways if you see it that way. One down pipe goes over the front pedestal minus seat and the other end down pipe goes over the rear pedestal minus seat. The middle down pipe is longer to reach the floorboard with a flat base added to the bottom of the pipe. It helped with puddling and aided runoff.
Its all one piece pick up from middle slide off then add seats back to go fishing.
|